Environmental Site Services fabricates Dust Deposition Gauges in house and in accordance with Australian Standard AS3580.10.1:2003, units are built to be robust with rust proof materials including galvanised steel or stainless steel, units are easily transportable and deployable with removal legs or posts with no fixings required. As units are fabricated in house they can be adapted to suit your project requirements including tripod legs for rocky areas or posts for sandy or longterm location deployment. Environmental Site Services also keep a large stock of glassware, stoppers and spares. Contact one of our helpful staff below.
Our Capabilities Include
- Dust Deposition Gauges
- Dust Deposition Glassware
The dust deposition gauges can be combined with other environmental monitoring equipment including:
- Real time dust monitoring for dust management
- Real time dust monitoring for compliance
- Type 1 noise monitoring equipment featuring real-time 1/1 & 1/3 octave analysis, SPL, Leq, SEL, Statistics – Ln (L1-L99), LMax, LMin, LPeak.
- Triaxial vibration monitoring equipment featuring RMS, VDV, MTVV or Max, Peak, Peak-Peak measurements.
- Weather monitoring equipment including Wind Speed, Direction, Relative Humidity, Temp, Temp inversions, Rainfall and Barometric Pressure