Asbestos products are commonly found in WA homes built before 1990 and a large portion of our residential and commercial building stock falls into that category.

Asbestos use was banned in Australia in 2003, but the ban did nothing about the thousands of structures already standing. When those asbestos containing materials are cut, drilled, broken or demolished, respirable fibres are released into the air. Inhaling asbestos fibres can cause severe respiratory illnesses, including lung cancer and mesothelioma, making uncontrolled disturbance a serious project risk.

Environmental Site Services (ENVSS) provides asbestos assessment, bulk testing, asbestos air monitoring and clearance inspections across Western Australia. We support developers, builders and demolition contractors with the field data they need to keep projects compliant and workers protected.

To learn more about our services and regulations around asbestos testing and removal, speak with our WA office.

Asbestos remains a critical issue for Western Australian property development

Much of Perth’s suburban housing and regional WA’s industrial and public building stock was constructed between the 1950s and late 1980s, when asbestos products were used extensively. Asbestos materials are commonly found in homes, but the same products appear in schools, hospitals, workshops and public buildings constructed during that period.

Infill development in established suburbs, brownfield conversions and refurbishment of older commercial premises all routinely intersect with legacy asbestos materials. Where asbestos is not identified before work begins, the consequences are predictable: unplanned stoppages, regulatory notices, budget overruns and potential exposure of workers or the community.

Developers must comply with Work Health and Safety laws, local government requirements and any conditions attached to planning approvals or demolition permits. Proper asbestos monitoring and documentation is essential to reduce the likelihood of these complications and protects the people involved in every stage of the project.

Common asbestos-containing materials in older WA buildings and structures

Asbestos was used in thousands of building products because it was cheap, strong and fire-resistant. These products were produced in large volumes and installed in structures across the state for decades.

Developers and builders commonly encounter asbestos in the following products:

They are most commonly found in fibro cottages, industrial sheds and older government buildings.

Asbestos in good condition and left undisturbed generally presents low risk. The concern arises during demolition, cutting, grinding, drilling or fire damage. Here, proper inspection is needed to confirm the presence of asbestos in materials before any disturbance occurs.

What is asbestos poisoning? Health risks caused by asbestos fibres

Asbestos fibres are microscopic; individual fibres are 50 to 200 times thinner than a human hair. When inhaled, they lodge deep in lung tissue and cannot be expelled by the body. Damage then accumulates over a long period.

Asbestosis, for example, is a chronic fibrosis of the lungs that restricts breathing capacity. Its symptoms usually develop 10 to 40 years after exposure, which means most people who develop the condition were exposed decades before their diagnosis. Common symptoms include:

With these issues in mind, developers should treat asbestos as a hazard that must be actively managed, and integrate assessment and monitoring into standard project planning, ensuring that decisions are not left to ad-hoc responses once work is underway.

WA’s regulatory framework for asbestos management

Asbestos monitoring is regulated by Western Australian safety and health guidelines. The primary legislation governing asbestos on construction, demolition and refurbishment sites includes the Work Health and Safety Act 2020, the Work Health and Safety (General) Regulations 2022 and the Work Health and Safety (Mines) Regulations 2022.

Key regulatory requirements for development sites:

RequirementDetail
Asbestos registerRequired for all workplaces, listing known or presumed asbestos-containing materials
Asbestos management planOutlines responsibilities, controls, training and monitoring
Licensed removalistsClass A licence for any friable asbestos removal; Class A or B for non-friable removal over 10 m²
Air monitoringWestern Australian Work Health and Safety regulations mandate air monitoring for asbestos removal involving friable material
Clearance inspectionsA licensed asbestos assessor conducts air monitoring and clearance inspections for Class A work

Failing to meet these obligations can result in enforcement action, penalties and project shutdowns.

Why your project needs a pre-construction asbestos audit

Identifying asbestos before design finalisation is more effective and more economical than reacting once works have started. An initial asbestos assessment involves our team inspecting properties for suspect materials, systematically checking accessible and concealed spaces, collecting bulk samples and preparing a site-specific asbestos register with condition ratings.

Accurate audit data lets your team avoid disturbing high-risk materials. Without this information, unexpected discoveries of friable asbestos can halt works, trigger regulatory action and cause schedule blowouts that the original budget never accounted for.

Air monitoring is another important step in detecting hidden asbestos during renovations and demolitions. These programs can be planned and scheduled alongside construction staging or arranged at short notice after a problem surfaces.

Environmental Site Services conducts targeted asbestos surveys for residential knock-downs, commercial fit-outs, industrial decommissioning and large-scale redevelopment projects across WA. ENVSS can assist project teams with developing a clear picture of asbestos risks before the first contractor mobilises to site.

Asbestos registers and management plans: the core documents for safety and compliance

An asbestos register is a live document listing known or presumed asbestos containing materials on site. Each entry records the material’s location, type, condition, friability and risk rating. Under WHS laws, a current asbestos register is required for workplaces in buildings constructed before 31 December 2003, unless asbestos has been verified as absent through sampling and inspection.

An asbestos management plan sits alongside the register. It sets out:

Both documents must be updated after removal works, new sampling results, incidents or changes to building use. Keeping them current protects your compliance and gives sub-contractors the details they need to work safely.

ENVSS can prepare or update asbestos registers and develop practical management plans tailored to the specific staging and construction methodology of a development project.

When asbestos testing and asbestos air monitoring are required

Asbestos testing and air monitoring provide objective data to support risk assessment, removal works and re-occupancy decisions. Monitoring is essential for confirming safe conditions during disturbance work.

When bulk testing is recommended:

When air monitoring applies:

ENVSS field technicians set up and manage asbestos monitoring programs, interpret results against guideline values and provide clear reporting for developers, principal contractors and regulators.

Clearance inspections and verification before re-occupancy or handover

After licensed asbestos removal, an independent clearance inspection is required before areas are re-occupied or further trades enter. A clearance inspection verifies areas are safe for re-occupation after removal work.

The clearance process involves several steps:

  1. Visual inspection of all surfaces, voids, ledges, ducts and crevices to confirm that no visible asbestos debris or dust remains
  2. Verification that all asbestos waste has been removed and disposed of correctly
  3. Review of asbestos air monitoring data (where applicable) to confirm fibre levels are below clearance thresholds
  4. Issue of a clearance certificate documenting the inspection findings

ENVSS provides independent clearance inspections and documentation, giving developers confidence that asbestos risks have been appropriately managed before the next project phase proceeds.

The practical benefits of early asbestos assessment and monitoring for developers

Early asbestos assessment delivers measurable project benefits across cost, schedule and compliance.

Knowing where asbestos is located before construction starts allows the demolition methodology and staging to be developed around real site conditions. Services routes can be designed to avoid asbestos pipe lagging rather than being redesigned after discovery. Unplanned site shutdowns caused by uncontrolled asbestos fibres during demolition can add weeks to a program and generate regulatory scrutiny that follows the developer beyond the current project.

Partnering with a specialist like ENVSS helps developers demonstrate due diligence and maintain a safer working environment across their project portfolio.

How Environmental Site Services supports asbestos risk management on WA projects

We’re a Western Australian environmental consultancy with strong field capability in asbestos assessment and asbestos monitoring. The ENVSS approach is practical, field-focused and built around delivering defensible data that supports project decisions.

Our asbestos services include:

Speak with an asbestos expert today

ENVSS works with developers, builders, demolition contractors, environmental managers and local governments across Perth and regional WA.

Our experienced technicians, modern monitoring equipment and clear reporting aligned to project milestones mean that asbestos data is available when project teams need it, not after the fact.

Contact our office to discuss your development.

‌